Geothermal Hybrid Tool
Engineering calculation dashboard

Geothermal Hybrid Sizing & Performance Tool

Load profile, discrete BOQ cost curve, and simple-payback optimization.

Not run
Module 1 profile
Not run
Module 2 curve
Waiting
Module 3 result
A

Mode A

Entered or calculated peak shaped by a selected EPW weather file.

Open →
B

Mode B

Monthly electricity bill back-calculation.

Open →
C

Mode C

Measured cooling load and COP from sensor data.

Open →
2

BOQ & CapEx

Discrete equipment selection at each geothermal share.

Open →
3

Payback Optimization

Choose payback, annual savings, energy savings, or lowest CapEx.

Open →
Module 1

Load Profile Engine

No final Module 1 profile selected.
Mode A

EPW Cooling Profile

Weather source

Entered design peak

Approximate building preset

Enter either total conditioned area or area per floor. If area per floor is used, add the number of floors when known.

Advanced heat balance

Roof, windows, doors and ventilation. Walls use side ΔT below.
WallU-value (W/m²·K)ΔT (K)Solar (W/m²)
North
South
East
West
Number of people is independent of heat/person.
Type sets W/person only; values remain editable.

Window / glazed-door solar irradiance (W/m²)

Solar / glazing constants

Mode B

Electricity Bill Back-Calculation

Attached example: HVAC fraction 0.3786, baseline COP 2.4, provisional nameplate 2,109.6 kW (600 RT).
Mode C

Sensor Data

Accepted names include Date, Time, Flow Rate (GPM or kg/s), Supply Temp C, Return Temp C, Diff C, Cooling Capacity (kW/TR), Power (kW), and COP.
Compare & Fuse

Final Module 1 Profile

Mode A supplies the hourly EPW shape. Mode B scales annual thermal energy from utility bills. Mode C checks measured peak, load-duration shape, and COP; incomplete sensor periods are not fabricated into missing months.

Module 2

BOQ & CapEx Cost Function Engine

Select a final Module 1 profile.
Enter 0 for geothermal-only BOQ testing.
Installation, civil, and electrical costs as a fraction of air-source equipment cost. Example: 0.15 = 15%.
Loading supplied BOQ…
Above one package, whole 450/500/600 RT combinations are selected by minimum BOQ cost subject to installed capacity ≥ required geothermal capacity.
SectionFamilyDescriptionUnitQtyUnit price SARSize / modelBehaviorCapacity (RT)
Module 3

Payback Optimization Engine

Run Modules 1 and 2 first.
15 years
Default objective: shortest simple payback. When a target utilization is entered, only geothermal candidates meeting or exceeding it are eligible.