Engineering calculation dashboard
Geothermal Hybrid Sizing & Performance Tool
Load profile, discrete BOQ cost curve, and simple-payback optimization.
Not run
Module 1 profile
Not run
Module 2 curve
Waiting
Module 3 result
Module 1 — Load Profile Engine: choose Mode A, B, C, or combine them
A
Mode A
Entered or calculated peak shaped by a selected EPW weather file.
Open →B
Mode B
Monthly electricity bill back-calculation.
Open →C
Mode C
Measured cooling load and COP from sensor data.
Open →2
BOQ & CapEx
Discrete equipment selection at each geothermal share.
Open →3
Payback Optimization
Choose payback, annual savings, energy savings, or lowest CapEx.
Open →Load Profile Engine
Mode A
EPW Cooling Profile
Weather source
Entered design peak
Approximate building preset
Enter either total conditioned area or area per floor. If area per floor is used, add the number of floors when known.
Advanced heat balance
Roof, windows, doors and ventilation. Walls use side ΔT below.
| Wall | U-value (W/m²·K) | ΔT (K) | Solar (W/m²) |
|---|---|---|---|
| North | |||
| South | |||
| East | |||
| West |
Number of people is independent of heat/person.
Type sets W/person only; values remain editable.
Window / glazed-door solar irradiance (W/m²)
Solar / glazing constants
Mode B
Electricity Bill Back-Calculation
Attached example: HVAC fraction 0.3786, baseline COP 2.4, provisional nameplate 2,109.6 kW (600 RT).
Monthly electricity (kWh)
Mode C
Sensor Data
Accepted names include Date, Time, Flow Rate (GPM or kg/s), Supply Temp C, Return Temp C, Diff C, Cooling Capacity (kW/TR), Power (kW), and COP.
Compare & Fuse
Final Module 1 Profile
Mode A supplies the hourly EPW shape. Mode B scales annual thermal energy from utility bills. Mode C checks measured peak, load-duration shape, and COP; incomplete sensor periods are not fabricated into missing months.
BOQ & CapEx Cost Function Engine
Select a final Module 1 profile.
Enter 0 for geothermal-only BOQ testing.
Installation, civil, and electrical costs as a fraction of air-source equipment cost. Example: 0.15 = 15%.
Loading supplied BOQ…
Above one package, whole 450/500/600 RT combinations are selected by minimum BOQ cost subject to installed capacity ≥ required geothermal capacity.
| Section | Family | Description | Unit | Qty | Unit price SAR | Size / model | Behavior | Capacity (RT) |
|---|
Payback Optimization Engine
Run Modules 1 and 2 first.
15 years
Default objective: shortest simple payback. When a target utilization is entered, only geothermal candidates meeting or exceeding it are eligible.